The manufacturing and assembly of a steel structure of the load-bearing structure of WD-1 and WD-2 flyovers within Bolesława Krzywoustego Street in Poznań. The flyovers over Chartowo and Żegrze Streets – a 93.58 m-long bridge structure consisting of two flyovers: WD-1 and WD-2. The width of a single platform is 20.32 m. The total width of two flyovers is 49 m. Each flyover consists of four lanes. The WD-1 flyover is for car, pedestrian and bicycle traffic along Bolesława Krzywoustego Street over Chartowo and Żegrze Streets towards A2 motorway to the Rataje roundabout. The identical WD-2 flyover is for traffic from the Rataje roundabout to A2 motorway. The flyovers over Inflancka Street – a 552.25 m-long bridge structure consisting of two flyovers WD-1 and WD-2. The WD-1 flyover is for car, pedestrian and bicycle traffic over Inflancka Street from A2 motorway to the Rataje roundabout. The identical WD-2 flyover is for traffic from the Rataje roundabout to A2 motorway. The flyovers consist of three lanes, each 3.5 m wide.
year of project: 1st stage: 2016, 2nd stage: 2017
tonnage: 2,500 tonnes