WROCŁAW AIRPORT
AVENIDA SHOPPING CENTRE, POZNAŃ
WROCLAVIA SHOPPING CENTRE, WROCŁAW
AIRPORT IN GDAŃSK
POSNANIA SHOPPING CENTRE, POZNAŃ
WD-1, WD-2 FLYOVERS, POZNAŃ
WD-1, WD-3, WD-4 FLYOVERS, WARSAW
KRONOSPAN Szczecinek
KP-6 FOOTBRIDGE, WILKOWICE
GESTAMP Września
VOLKSWAGEN Września
HOMANIT Krosno Odrzańskie
CH GALERIA MALTA Poznań
POMERANIAN METROPOLITAN RAILWAY, GDAŃSK
GALERIA KROTOSZYŃSKA SHOPPING CENTRE, KROTOSZYN
GILLETTE FACTORY, ŁÓDŹ– realizacja 01.2013 – 07.2013 r.
The manufacturing, delivery and assembly of a 900-tonne-steel structure required for the extension of the production facility of Gillette blades and razors.
TONNAGE: 900 TONNES
YEAR OF PROJECT: 2013
Investment location