The maufacturing and assembly of a steel structure for the GESTAMP production facility in Września. The supporting structure is made up of welded solid columns and bars, supported by lattice purlins which are also the structure for the roofing. The transverse system of the hall was designed as a three-bay frame with a span of 3 x 36 m and a height of 19 m. The main layout is braced in three fields in each axis of the load-bearing columns in the hall. Warehousing facility – the load-bearing structure is made up of welded solid-walled columns and rafters, supported by lattice purlins which are also the structure for the roofing. The transverse system of the hall was designed as a three-bay frame with a span of 3 x 36 m and a height of 11 m. The main layout is braced in two fields in each axis of the load-bearing columns in the hall.
YEAR OF PROJECT: 2015
TONNAGE: 1,780 TONNES